Reliacon Sdn Bhd
25-01, Jalan Bayu Puteri 1/3,
Taman Bayu Puteri,
80150 Johor Bahru,
Johor, Malaysia.
+607-3318892
+607-3329892
Branch
12-1, Jalan KL 3/13,
Taman Kota Laksamana Sek 3,
75200 Melaka,
Malaysia.
 +606-2839882
 +606-2839892

Project

49 - 72 of 109

Circular and seperated pile caps

Front view when RC structure completed

Completed view

Shear wall construction

One concrete casting completed all under ground structure together with the ground slab

Front view of the building, notice that there is no big transfer beam.

Complicated entrance roof structure.

Half way erected.

Internal view of the light vehicle area.

Band beam design was used to create long cantilever slab

Zoom-in view of the structure model of the link bridge levels

Three slanting steel columns at the atrium. These three slanting steel column support three floors from side, two floors and one roof on top.

Square pile caps with beams

Completed view

Completed view

Use of simple stair stringers

Use of 1st floor shear wall to hang the 1st floor slab eliminate beam at the edge of staircase opening. Help to reduce construction cost and improve clear ceiling height.

Complicated circular hollow section connection

Nearly completed building with roof installed.

Typical base connection between tree columns and RC structure.

Floor drift under wind load in principal x direction

The Sail ,Melaka (9 blocks, 62 storeys, 255m tall mixed development of hotels, condominium,office and retail)

Johor Bahru -Twin Towers Residence

Bali Residences, Melaka (2 blocks of 40 storey apartments)

49 - 72 of 109